Skip to main content
GullySystem

Architect and Contractor Accounts for Tile Showrooms

Builders, contractors and interior designers buy across several sites at once. Each account holds its sites, its orders and its running balance in one place.

What an account holds

The firm and the people

The firm name, the GST number where there is one, and the people who actually place orders and sign challans at site.

Sites under the account

A contractor may run four sites at a time. Orders, deliveries and invoices sit under the site they belong to, not in one long list.

Agreed rates

The rate a contractor gets on a series can differ from the walk-in rate. The agreed rate sits on the account and is picked up when quoting.

Running balance

Invoices, part payments, credit notes for returned boxes and any charges, in date order, with the balance after every line.

Referral arrangement

Where you have an understanding with an architect or designer, what was agreed and what has been settled is kept. The arrangement itself is yours.

Why site-wise matters

A builder rings about one site and nothing else. Reading a single mixed ledger for four sites is how a collection call goes wrong. With orders and invoices sitting under their own site, the counter can say what that site owes, what went out last week and which boxes are still pending. An owner also sees which sites run clean.

Credit at the counter

Limit and warning

A credit limit can be set for an account. The counter is warned when a fresh order would carry the account past it.

Release with dues

Whether a load leaves for a site with dues outstanding stays a decision you keep with named staff.

Collection list

Accounts carrying balances past their agreed days appear as a call list for the owner or the accounts clerk.

How showrooms handle designers

Architects and interior designers rarely buy on their own account. They specify, and their client pays. Some showrooms agree a share with the designer, tied to the discount given to the client. Others give a flat courtesy. The record needs two things: which designer brought which job, and what was agreed. Without that, a year later nobody remembers the terms and the designer, politely, asks.

Questions to settle with the owner

How is a site opened?

By the contractor’s call, by a quotation accepted or only on first invoice.

When is a site closed?

On the final bill, or after the last return is credited.

Who may override the limit?

Name the person. A limit that anyone can override is a suggestion.

Statements for a contractor

A contractor wants a statement per site, not one long page. Print it with invoices, receipts and credit notes in date order, and the balance at the foot. Send it before the call, so the call is about payment, not about numbers.

What architect accounts do not do

It does not fix your credit terms, your contractor rates or your referral arrangements. Those are commercial choices. How a referral payment is treated in your books is a tax question, and your accountant answers it. The module keeps what was agreed and what was paid. It also will not chase a builder for you, though it will tell you whom to ring.

Handling designer accounts across a trading week

A designer or contractor account is used all week, by different people, for different reasons. Follow one account from Monday’s site visit to the Saturday settlement. Every stop shows who opens the account and what they look for. It is a short tour.

Monday site measurements arrive

A builder phones with measurements for a second-floor flat. The counter opens the account, picks the site and starts a quotation under it. Earlier orders for that building sit right there. Nobody has to ask what was sold.

A godown call on Wednesday

The godown supervisor opens the same account to see which site a lorry is loading for. The site name and order number are on screen. The load is booked against the correct building. Mix-ups with a similar name are avoided.

The designer asks about dues

On Thursday an interior designer rings to ask what is outstanding. Staff read out the running balance by site, not as one lump. The designer sees which building holds the pending amount. A clear answer saves a long call.

Saturday settlement at the counter

One contractor arrives with a cheque covering two sites. Accounts post one part to each site’s dues, and the remainder stays open on the third. By evening the account shows one site still behind. Dues are chased from that line.

Terms to agree before an account is opened

The owner sets ground rules for these accounts before the first one goes in. Credit terms, site names and who may raise discounts all need a written answer. Without that, each counter person invents a private habit. Write the answers down.

Who may open a new account

Decide whether any counter person can create an account or only a manager. A single named approver keeps duplicate contractors out. It also gives the owner one name to ask when two accounts look alike.

What a site name must contain

Agree on a pattern, such as building name, tower and floor. A fixed pattern lets anyone search and find the right site. Free typing produces five spellings of one flat. Each spelling then holds part of the balance.

Moving existing balances across

Choose a cut-over date and load each contractor’s opening balance, split by site where the paper allows. Balances that cannot be split go in under one general site. Clean them up as payments arrive. Keep the opening figures as they stood.

Which statement the owner reads first

Pick the one report the owner opens each week, perhaps accounts over their credit limit or sites with no payment in a while. Settle that early. It shapes what staff are asked to record from the first day.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Release with dues

Can you explain the balance from its original documents?

Select a partly settled example in “Release with dues”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Agreed rates

Which rule wins when two rates or offers apply?

Use “Agreed rates” to check an ordinary sale and one that meets two pricing conditions. Ask for the calculation behind each final amount, rather than only the total.

Background reading: ERPNext: pricing conditions

FAQ

Frequently asked questions

Can a contractor get their own rates?

Yes. An agreed rate per series or size sits on the account, and a quotation built for that contractor uses it.

Are invoices kept site-wise?

Yes. Each site under the account carries its own orders, challans and invoices, with its own balance.

Can a credit limit block an order?

It can warn, and it can block for staff who may not override. Which staff may override is your decision.

Is architect commission worked out here?

What was agreed and what has been paid is recorded. The arrangement and its treatment in your books stay with you and your advisor.

Can one architect be linked to many contractors?

Yes. The designer’s account lists the jobs they brought, whichever contractor executed them.

What if a contractor disputes a balance?

Open the site, read the lines in date order and compare them with the contractor’s copies. Most disputes end at one missing credit note.

Can a site be moved to another contractor?

Check this during scoping. Moving a site mid-job changes whose balance it is, so enter it as a fresh site instead.

Where it fits

How this feature fits the system.

Tile and Sanitaryware Showroom Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Room-wise quotations

Sales staff quote bathroom, kitchen, hall and balcony separately, placing tiles, sanitaryware and fittings under each room, with every revision kept.

Estimate/Quotation Management

Shade lot and batch records

Receiving staff enter the lot number of each series as a truckload arrives, so a buyer’s boxes are reserved from one lot.

Batch and Serial Tracking

Warehouse and display stock

Warehouse staff count boxes by rack and bay, keep display pieces apart from sellable stock and watch series that fall below reorder level.

Warehouse Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements