Skip to main content
GullySystem

Room-Wise Tile and Sanitaryware Quotations

A quotation is built room by room, with tiles by the box and fittings by the piece. Every revision is numbered and kept, so the counter can show what changed.

How a quotation is put together

Rooms first

Bathroom one, bathroom two, kitchen, hall, bedrooms, balcony and staircase stand as separate blocks on the sheet.

Area into boxes

The area of a room is typed in square feet. It is converted into whole boxes for the size chosen, with the wastage allowance you use added on top.

Tiles, sanitaryware and fittings

Floor and wall series, skirting, WC and basin models, mixers and accessories all sit under the room they are meant for.

Rate and tax

Your rate for the size or model comes from the catalogue, and GST is applied at the rate held against that item.

Revisions

A buyer swaps the series, drops a bathroom or asks for a cheaper floor. Each version is saved and numbered, and the old one stays readable.

The arithmetic behind a box count

Public tile guides agree on the method. Take the net area of the room, add a waste allowance, divide by what one box covers, and round up. Rounding happens room by room, not across the whole house, so five rooms never share half a box. Where a box label gives only pieces, the coverage comes from piece size times piece count. Wall tiles in a bathroom run higher than a plain hall floor, since cuts around fixtures eat tiles.

Why the wastage allowance varies

Layout

Diagonal and patterned lays waste more than a straight lay, and guides give higher figures for them.

Tile size

Large formats break and cut differently from small wall tiles.

Mason skill

A trusted mason wastes less. Some showrooms add a little for sites with new crews.

Spare box

A spare box from the same lot is worth keeping for a later repair. The quotation can show it as its own line.

Sending it out

The sheet prints on your letterhead and can travel to the buyer over WhatsApp or email. Contractors want it broken up room by room, while a house owner wants one total with the rooms listed below it. Both come off the same record. A validity date can be printed, because company rates on a series can change before the buyer comes back.

From quotation to order

Approval

An approved sheet becomes an order without retyping, and the boxes it needs are reserved from one shade lot.

Part orders

A buyer may approve the flooring now and the bathrooms after the plumbing is finished. The sheet can be ordered in parts.

Lost quotations

One that goes nowhere gets a lost reason against it. Rate, delay and another showroom are the usual ones.

What the quotation does not settle

The wastage allowance is a rule you set, not a measurement of the site. Breakage during laying, the pattern a mason follows and the adhesive or cement needed all sit outside this module. Your accountant or advisor settles how GST is charged on a bill holding both tiles and fittings. Freight and unloading appear on a quotation when you add them, and not otherwise.

A quotation’s life from counter to site

Follow one from first measurement to final revision. Each stage reveals who opens it, what changes and why the numbered versions matter. Take one bathroom and one hall.

Taking measurements at the counter

A homeowner brings a sketch with room sizes. The counter keys each room, picks tiles and fittings, and lets the sheet work out boxes. Version one is saved. The buyer takes a printout home to think.

Revision two after a design change

Two days later the designer swaps the wall tile. The counter opens the quotation and edits that room only. Version two is saved beside version one. Both can be read side by side. The change is plain.

The godown reads the approved version

When the buyer agrees, the approved version converts to an order. The picker works from that version number. No one lifts boxes from a draft. Questions about what was agreed are settled by naming the version.

The owner reviews open quotations

Those with several revisions get a call. The record shows the room that changed again and again. It points to what the buyer is unsure about.

Decisions to make before quotations go out

A quotation sets expectations for a buyer, so its rules need an owner. Settle who may issue one, what it must show and how revisions are named. These choices are made once at set-up. Staff then follow them. Write each rule down.

Who may discount a room

Decide whether counter staff can change a rate or only a manager. A fixed limit for each role avoids private deals. Write the limit down so a buyer’s request meets one clear answer. Keep it simple.

What shows on the printed sheet

Choose which lines the buyer sees. Some showrooms print box counts and rates. Others print only totals per room. Pick one style and keep to it. It will decide how much argument begins at the counter.

How old quotations come across

Agree whether open quotations from the paper file are keyed in. Recent ones with live buyers are worth entering. The rest stay in the folder. A cut-off by date keeps the first week of entry manageable for staff.

Which wastage figure is the default

Settle the allowance the counter uses when the buyer says nothing. Large rooms and diagonal layouts may need more. Name the starting figure and who may alter it. That way two staff quote the same room alike.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Revisions

Which version applies to work that has already started?

Use a revised example from “Revisions” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Room-Wise Tile and Sanitaryware Quotations

Which assumptions stop being valid when the quotation changes?

For “Room-Wise Tile and Sanitaryware Quotations”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can the wastage allowance differ by tile size?

Yes. Large formats carry a different allowance from small wall tiles, and the figures you work with are set at implementation.

Does the buyer see boxes or square feet?

Both can be printed. The line carries the area, the box count and the rate, so nothing has to be worked out again at site.

How many revisions can a quotation have?

There is no fixed limit. Each one is numbered and kept, and any earlier version can be opened.

Can a quotation be sent on WhatsApp?

Yes, where a business account is in place. Otherwise it goes by email, or it is printed at the counter.

How many extra tiles should a buyer order?

Guides commonly suggest an allowance on top of the net area, and more for diagonal layouts. Your counter sets the allowance it trusts, and the sheet applies it.

Can I quote the same room with two series side by side?

Yes, as two versions or two blocks. The buyer compares totals, and only the chosen one goes to an order.

Is the quotation price locked once sent?

Only for the validity you print on it. After that, rates are refreshed from the catalogue when the sheet is revised.

Where it fits

How this feature fits the system.

Tile and Sanitaryware Showroom Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Room-wise quotations

Sales staff quote bathroom, kitchen, hall and balcony separately, placing tiles, sanitaryware and fittings under each room, with every revision kept.

Estimate/Quotation Management

Shade lot and batch records

Receiving staff enter the lot number of each series as a truckload arrives, so a buyer’s boxes are reserved from one lot.

Batch and Serial Tracking

Warehouse and display stock

Warehouse staff count boxes by rack and bay, keep display pieces apart from sellable stock and watch series that fall below reorder level.

Warehouse Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements