Skip to main content
GullySystem
Community · Software for manufacturing associations

Keep every member factory, sector group and subscription on one register.

A manufacturing association speaks for factories, so it needs to know each plant, its products and its sector group. The association software holds the member register, subscriptions, committees, circulars, plant visits and trade-fair stalls. One record per company serves everyone.

At a glance

A manufacturing association is a body of factory owners that meets, lobbies, trains and trades together. Its strength comes from knowing who the members are, what they make, which sector group each belongs to and who speaks for each plant at committee. Lists go wrong otherwise.

It starts with the plant. One member company can own three units, join two sector groups, send different people to different committees and still expect a single invoice and one clear welcome letter.

How the work runs today

The secretariat receives membership applications from new factories, each with a company name, unit address, product range, employee count and two referees. The committee reviews them. Approved members get a number, a sector group such as foundry, plastics or electrical, an annual subscription invoice and a place on the circular list for that group. Circulars on tax changes, export schemes and power tariffs follow. They go to the right list.

Through the year the office books seats at training days, plant visits and buyer meets, and sells stalls at the annual trade fair. Committee minutes, representations to authorities and survey returns from members pile up in folders, and nobody outside the secretariat can find last year’s copy. Renewals fall due together. A clerk chases lapsed members.

Where it breaks

What goes wrong for manufacturing associations without a proper system.

One company, several units

A factory group joins once but runs three plants across different sectors, and the register keeps a single line for the whole group. The foundry unit hears nothing.

Sector lists are rebuilt each time

A notice must reach steel fabricators only. The clerk filters a spreadsheet by hand, and half the plants are tagged with an old product, so some are missed.

Stall bookings and subscriptions mix

A member pays for a trade-fair stall and a year of dues in one cheque, and the receipt covers neither line clearly enough for the audit. The treasurer cannot split it.

Committee work leaves no trail

A working group drafts a memorandum on power tariffs, yet the draft, the members who commented and the final copy sent to the ministry sit in four inboxes.

Survey returns do not add up

Replies come as forms and photos. Sector totals get keyed in weeks afterwards, and the secretary has no list showing which member plants ignored the reminder.

What the software does

What we would build for manufacturing associations.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Member company register

Hold each factory with its units, product range, headcount, referees and the people who speak for it. Plants sit under the parent.

Applications and committee approval

Take an application online, send it to the executive committee for review, record the decision and issue the member number with its certificate in the same step. The decision stays on file.

Subscriptions and dues

Raise the annual subscription by member category and post receipts. Lapsed members surface. Oldest dues come first.

Sector groups and committees

Place every plant in one or more sector groups, such as forging or packaging, and cut lists by district or size when a notice needs it. Each committee has its own file. Members, meetings, minutes and representations sit inside it.

Circulars to the right list

Choose a sector group, a district or one committee, then dispatch the notice over mail, text or chat, carrying the tariff order or any other file on that same entry. The log names every recipient.

Events, plant visits and trade-fair stalls

Book seats at training days and buyer meets, plan plant visits and sell stalls by hall and number, with each fee kept apart from the annual dues. Passes are issued per stall.

Member surveys and returns

Send a capacity or export survey to chosen plants, collect the replies by form and total them by sector, so the board sees actual numbers and not guesses. Chasing replies is easy.

Before you talk to a supplier

A requirements checklist for manufacturing associations.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for manufacturing associations.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

Manufacturing Association Management Software

Member factory register, applications, committee approvals, subscriptions, sector circulars, events, trade-fair stalls and surveys for manufacturing associations.

See the product
Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Common questions

Questions manufacturing associations ask before they call.

Can one member company hold several factory units?

Yes. A parent carries its own plants. Each has a product range and a sector group. Dues can be charged once for the parent or once per unit, whichever your bye-laws say, and the invoice lists the units covered.

Can a committee approve applications from its own screen?

Yes. Committee members see the applications waiting for them, with referees and plant details, and record approve, defer or reject from their own login. The date is kept.

Do we need a secretariat to run this?

Two people can do it in a small body. Larger associations spread the screens across membership, accounts, events and the committee secretaries, each person seeing only their own work.

Can our old member list be brought in?

Yes. We load the spreadsheet or register, match duplicate companies with you and flag plants with missing sector tags before anything reaches members. You review the first directory.

How is an association system quoted?

The parts chosen: member register, applications, subscriptions, sector groups, circulars, events and stalls, surveys. Staff users, member units and any payment or accounts link affect the scope. Old member lists need moving. Screens on your lists come first, and each part is itemised afterwards.

What should an association gather before the project starts?

Gather the member list, an application form, subscription records, the committee minutes format, a recent circular list and an event booking sheet. The secretary, an accounts person and one committee representative then answer questions and check screens.

If the association changes tools, who has the member data?

The association. Source code and all records are its own, and members, dues and minutes can be extracted in ordinary file formats whenever needed. The team behind the build supports it, and GullySystem hosts unless you prefer otherwise.

What happens after I share my requirements?

An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. A senior engineer reads your answers. Nobody phones first.
  2. Within one business day you get a written note: what we understood, what we would start with, and the questions we still have.
  3. If it fits, a proposal follows with the order of work, what we need from you and what you receive at each step.
  4. No call is booked and nothing is paid until you have read the note. Your details stay with us.

Start with your requirements

Seven short steps that tell us what you need. A senior engineer reads them before anyone gets in touch.

Share your requirements