Skip to main content
GullySystem
Media · Software for tV and OTT production companies

Every episode, from script lock to the final master.

A TV or OTT production company keeps scripts, stripboards, deal memos, call sheets and post notes in separate files, so an episode’s true cost is known late. One record carries every season, episode and deliverable. Delivery status and cost to complete are visible each morning to the producer and the line producer without a weekly report.

At a glance

A series is made one episode at a time. Each passes through writing, prep, shoot, edit, sound and delivery, and the commissioning platform signs off along the way and every approval changes what the next team may do. A late sign-off ripples downstream.

Most companies run this from a shared drive in the production office, a spreadsheet of shoot days and a cost report from the line producer. Nobody reads the numbers beside the schedule until an episode has overrun, and by then the retake budget and the edit suite booking are gone. It is late.

How the work runs today

The line producer builds the episode budget from the script breakdown and sends the shooting schedule to the first assistant director, while the production coordinator issues cast and crew deal memos. Recce notes, permits, generator hire and unit vehicles are booked against shoot days, and call sheets go out the evening before with cast pickup times and the nearest hospital. A wrong sheet wastes a morning.

On set, the daily production report records scenes shot, pages completed, overtime and lost time, while the data wrangler copies camera cards and checksums them and makes ProRes proxies. The commissioner sends notes on each cut, and those notes decide whether the episode moves on to the colourist and the sound mix or goes back to the editor. Edits wait on them.

Music cues, archive clips and artwork need clearance before delivery, and the accountant compares each week’s costs to the episode budget while the errors and omissions policy is renewed. The commissioner releases each payment tranche only when the agreed masters, caption files, textless versions and cue sheets arrive, so a missing file holds up the money.

Where it breaks

What goes wrong for tV and OTT production companies without a proper system.

Episode cost is known after the shoot

Costs arrive weekly. The report is built from invoices and timesheets, so by the time anyone reads it the shoot days that caused the overrun are finished and the money is gone.

Script versions and commissioner notes drift apart

Revised pages circulate in pink and blue. The director, the line producer and the editor can each be working from a different draft, and the commissioner’s notes refer to a fourth.

Cast and crew bookings sit in several sheets

Each department keeps its own holds. A double-booked actor is found on the morning of the call, when the unit is already assembled at the location and a day is lost.

Deliverables are tracked by memory

Masters, archive copies, subtitles, textless versions, music cue sheets and clearance papers are due in different formats, and missing a single one holds back a payment tranche. Chasing begins. Emails multiply.

Daily reports are not tied to the schedule

The daily report is written, signed and filed. Nobody compares it to the planned day until the week ends, so a pattern of late starts or slow company moves goes unseen.

What the software does

What we would build for tV and OTT production companies.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Series, season and episode register

Hold each series with its seasons and episodes. Each series record names the commissioning platform, lists delivery dates and shows which executive approves every stage. Nobody books the edit suite blind, because an absent sign-off is visible on that same page.

Script breakdown and shooting schedule

Break each script down. Cast, location, props and day or night are tagged on every scene, and scenes are ordered into shoot days with page counts and a day-out-of-days chart for each actor.

Call sheets and daily production reports

Issue the call sheet with cast times, locations, unit lists and nearest hospital, then after wrap record scenes shot, overtime, meal penalties and lost time against the planned day.

Cast and crew deal memos

Record rates, wrap dates, holds, credits and turnaround periods for each person, and keep memo status beside the booking so an unsigned deal is flagged early.

Episode budget against actual cost

Compare the budget to purchase orders, guild fringes, timesheets and invoices by episode, with cost to complete shown per line, so an overrun shows while it can be fixed.

Post-production and delivery tracker

Follow each cut through commissioner notes, picture lock, conform, colour grade, stereo or Atmos mix and quality check, then list the masters and files still owed.

Clearances and music cue sheets

Log music, archive footage, artwork and location releases against the scene, with the signed document and an expiry noted, so a lapsed licence is caught before delivery. The cue sheet is built from these entries.

Before you talk to a supplier

A requirements checklist for tV and OTT production companies.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for tV and OTT production companies.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

TV and OTT Production Company Management Software

Every episode on a register, plus shooting schedules, call sheets, deal memos, daily reports, episode budgets, post-production stages and deliverables for TV and OTT producers.

See the product
Solutions inside

The business modules tV and OTT production companies use most.

Each one is also available on its own, or inside a system built for you.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Common questions

Questions tV and OTT production companies ask before they call.

Does it replace our scheduling software?

It can. Scenes, cast and locations are scheduled here, and if your first assistant director prefers a dedicated scheduling tool the finished day plan can be brought in instead.

Can costs be kept per episode?

Yes. Each episode has its own budget lines and the season view adds them up, while overheads shared across episodes are split by a rule the finance team chooses.

Can the commissioner see our records?

Only if you decide so. A limited view can show cut status and delivery items to the commissioner’s editor, while budgets and deal memos stay with your team.

What shapes the price?

The figure moves with how many series you run, how large the production office is and whether the ledger needs a link. Working screens come first. Only after that does the proposal name a sum.

What happens after I share my requirements?

An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements