Track every panel from the cutting list to the processor to its mark on the elevation.
Toughened glass cannot be cut after it leaves the furnace, so a wrong figure on a cutting list means a fresh order and a long wait. This software tracks every panel from the glass schedule to the processor to its mark on the elevation. Aluminium, ACP and structural silicone are held against the project, and each stage bill is built from measured area.
Glass that has been through the furnace cannot be cut. A wrong size means a fresh order and a wait, while the crane, gondola and crew stand idle.
Panel by panel is the level that works, so the cutting list, processor order and installation mark all point to one record. A good first test follows one panel through your files, from the construction drawing to the elevation.
A builder or architect sends façade drawings and a bill of quantities, or a homeowner wants shower cubicles and railings, and the schedule is built from them. You prepare shop drawings and a glass schedule with sizes, thickness and type, and quote per square foot. After approval the glass goes to a processor for toughening, lamination or DGU, and aluminium profiles are cut and fabricated for a stick or unitized system.
On site, crews fix the aluminium framing and then the glass, often from a gondola or scaffold. Spider glazing, ACP cladding and balustrades run alongside. Broken panels go back for reprocessing. Each month you measure the area installed and raise a stage bill, which the builder certifies with retention held back.
What goes wrong for glass and façade companies without a proper system.
What we would build for glass and façade companies.
Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.
A requirements checklist for glass and façade companies.
What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.
A product already built for glass and façade companies.
It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.
Glass and Facade Company Management Software
Glass schedules, processor orders, panel tracking, profile and sealant stock, installation logs, breakages and measured progress bills for glazing and facade contractors.
Other products in the same sector as glass and façade companies.
- Construction Project Management Software
- Expense Management Software
- Interior Design Management System
- Electrical Contractor Management Software
- Elevator Service Management Software
- IoT Monitoring Dashboard
- Tile and Sanitaryware Showroom Software
- Home Automation Company Management Software
- HVAC and AC Service Management Software
- Modular Kitchen Business Management Software
- Painting Contractor Management Software
- Pest Control Business Management System
- All industry products
The business modules glass and façade companies use most.
Each one is also available on its own, or inside a system built for you.
- Estimate/Quotation Management
- Purchase Order Management
- Barcodes and Labels
- Stock Tracking and Alerts
- Job Cards
- Project Document Management
- Proforma Invoice Management
- All business solutions
All solutions by area
- Applicant Tracking (5)
- CRM (8)
- Finance & Accounting (10)
- Helpdesk (4)
- Human Resources (13)
- Inventory Management (5)
- Project Management (7)
- Manufacturing (6)
- Procurement (4)
- Sales and Distribution (6)
- Field Service (5)
- Statutory and Compliance (4)
- Retail and POS (4)
- Bookings and Appointments (3)
- Subscriptions (2)
- Assets and Fleet (4)
- Platform (6)
- Analytics (2)
- Documents (1)
Where AI can help glass and façade companies.
Each one reads records you already keep, and a person approves every decision.
The services behind it.
ERP, CRM and Business Software Implementation
One record of stock, orders, customers and accounts, set up so your team opens it every day.
Learn moreBusiness Process Automation
Approvals, reminders, follow-ups and reports that run on their own instead of on someone remembering.
Learn moreCustom Software and Product Engineering
Software built around how your business actually runs, when nothing off the shelf fits without workarounds.
Learn moreWeb and Mobile Application Development
Web and mobile apps for customers, field staff and dealers, built to work on ordinary phones.
Learn moreAll our other services
- Software Maintenance, Support and Rescue
- AI and Intelligent Automation
- API and System Integration
- Data Engineering and Business Intelligence
- UI/UX Design and Prototyping
- Cloud Engineering and Managed Infrastructure
- DevOps & Automation Services
- QA and Software Testing
- Performance Engineering
- Cybersecurity and Application Security
- IoT and Edge Computing
- Technology Strategy and Product Consulting
- E-Commerce and Digital Commerce
- MVP Product Development
- SaaS Product Development
- WhatsApp Business API and Chatbots
- Data Migration and Moving Off Spreadsheets
- Training and Adoption
- Data Protection and Privacy Readiness
- Tax and e-Invoice Engineering
- Managed IT Support
- Dedicated Team and Staff Augmentation
- Business Intelligence and Reporting Tools
- Cloud Cost Optimisation
- Global Compliance and Localisation
Written for glass and façade companies.
Practical notes on running the business, not product marketing.
How the work runs from Bengaluru for your city.
- 1
The audit, by call
A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.
- 2
A written proposal
Scope, what we build first and the cost, agreed in writing before anything starts.
- 3
Build in short rounds
Working screens shared every few weeks. Your team tests them from your own office.
- 4
Go-live, in person when it helps
For data migration and training we can come to your city. Travel is agreed in advance.
- 5
Support online
Fixes, changes and hosting handled remotely by the same team that built it.
The work we have published.
We only name clients whose work is published. None of them is in this trade; they show how the team works, not that it has built for this trade.
PetSeva: matching owners to the right vet, at any hour
A two-sided veterinary platform where vets are searchable by specialisation and bookable outside clinic hours. It now carries more than 2,000 veterinary doctors.
Read the case study Paying guest accommodationSAM Atithi Pavathi: bed-level occupancy as the source of truth
PG management software where allocation, rates and invoices are derived from bed-level occupancy and not maintained in parallel spreadsheets.
Read the case study School transport servicesSAM Tours: school transport on a single ledger
Registration, fee collection, routing and finance write to the same records, closing the gap between journeys run and fees collected.
Read the case study Microfinance and Self Help GroupsVikasa RDO: making SHG loan recovery auditable
Loan proposals, recoveries and commissions sit on one record, with a person attached to every state change, so a business handling a bank’s money can show where each rupee went.
Read the case studyQuestions glass and façade companies ask before they call.
Can it work alongside my accounting package?
Not built in. If your accountant wants processor purchases and stage bills as an export file, that is added at implementation and priced on its own.
We mostly do shower cubicles and railings. Do we need this?
Probably not. A simpler order and measurement system will do for retail glazing. Panel tracking earns its cost on façade and structural glazing work.
Can the processor see our orders?
Yes, if they are willing and the view is built. They would get a narrow view of your orders and update status per panel. Otherwise your office updates it.
Can the builder see progress by elevation?
Yes, if it is part of the build. A builder view would show panels and ACP sheets installed by elevation and floor with photos, and the area ready to bill.
How is a façade contractor’s system priced?
Projects running together, the size of the glass schedules, the processors you order from and the users in estimating, stores and site all play in. Stage billing from measured area is a distinct part. A quotation is produced after scope review, line by line.
What should a glass contractor bring at the start?
Bring a glass schedule with elevation marks, a cutting list, a processor order, a stock sheet of aluminium and ACP, a breakage note and a stage bill. Free up a site engineer and a purchase person to confirm each screen.
What happens to our schedules and breakage logs if we leave?
They stay with you, alongside the code. Glass schedules, order status and breakage causes can be written out in plain files at your discretion. Our team goes on supporting it. Hosting is with GullySystem, and you may choose another host.
What happens after I share my requirements?
An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.
How much will the software cost?
We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.
Bengaluru areas with many glass and façade companies.
Related industries.
- Builders and contractors
- Commercial interior fit-out contractors
- Construction project managers
- Electrical contractors
- Elevator companies
- Energy management companies
- Flooring companies
- Home automation companies
- HVAC contractors
- Interior designers
- Modular kitchen companies
- Painting contractors
- Pest control companies
- Plumbing contractors
- Solar installers
- Solar plant maintenance companies
- Waterproofing contractors
- Windows and doors companies
Part of a wider group.
Tell us how your business runs today.
A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.
What happens after you share your requirements
- A senior engineer reads your answers. Nobody phones first.
- Within one business day you get a written note: what we understood, what we would start with, and the questions we still have.
- If it fits, a proposal follows with the order of work, what we need from you and what you receive at each step.
- No call is booked and nothing is paid until you have read the note. Your details stay with us.
Start with your requirements
Seven short steps that tell us what you need. A senior engineer reads them before anyone gets in touch.
Share your requirements