Construction · Software for commercial interior fit-out contractorsRun each fit-out site from BOQ to snag list, with subcontractor and client billing.

A commercial fit-out contractor builds offices, showrooms and shops against a priced bill of quantities (BOQ) and a tight handover date. Partition, ceiling, electrical, HVAC, flooring and painting gangs are each paid on measurement. The interior design and construction products hold the BOQ, work orders, running bills, materials and site progress for each project, and the snag list and handover file are added as custom work.

At a glance

A fit-out contractor works to a client’s drawings and a priced BOQ, not to a design of its own. Money is made or lost in measurement sheets, variation orders and payments to small subcontractors.

Several sites run together, each at a different stage, from partition marking to final painting. The owner needs one view of what the consultant has certified, what is billed and what each gang is due.

How the work runs today

A tender arrives with drawings and a bill of quantities. The estimator prices it item by item. After the award the project manager splits the work into packages for civil, drywall partition, grid ceiling, electrical, HVAC ducting, vinyl or timber flooring, joinery and painting.

Site engineers record progress against each BOQ line and raise indents for gypsum board, plywood, laminate, cable and light fittings. Subcontractors are paid on measured work, with advances and recoveries shown against each work order.

Clients ask for variations in the middle of the job, by email or on a site visit. At the end a snag list is walked with the client’s facilities team, rework is closed, and the final bill waits on the handover certificate.

Where it breaks

What goes wrong for commercial interior fit-out contractors without a proper system.

The BOQ and the site drift apart

Quantities change on site, and the engineer’s working sheet no longer matches the priced BOQ. A moved partition or extra cable run goes unbilled.

Subcontractor measurements are disputed

Each gang keeps its own record of work done and the engineer keeps another. Payment to the painter or the false ceiling team waits on an argument.

Running bills take days to build

Measurements, deductions, advance recovery and retention are pulled together by hand from site notebooks. The running bill leaves the office late.

Material is ordered more than once

Requests for plywood or cable come by call and message, and the store cannot tell what is already on order. Surplus laminate sits at site.

Snag lists live on paper

Items are noted on a printout during the walk with the client’s team, and closure is chased on calls. Handover slips past the date.

What changes

What commercial interior fit-out contractors gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Running bills measured against each BOQ line

Site engineers record progress against each line of the bill of quantities, and the running bill reads from those entries. The quantity surveyor sees what a drywall gang has measured against what is certified. Disputes at bill time start from figures already on the record. Measurement settles the argument.

Subcontractor advances and recoveries on the work order

Each work order for partition, ceiling or HVAC ducting shows the advance paid, the recoveries taken and the measured work to date. Accounts do not hunt through emails to learn what a joiner is owed. The project manager sees the balance before approving the next bill. Balances are never a guess.

Variation requests priced before the work starts

A client’s mid-job request is logged as a variation with its drawings, quantities and rate. The estimator prices it and the client approves it in writing. Work above the false ceiling no longer begins on a verbal word from a site visit. Every variation has a paper trail.

Indents matched to what the site has consumed

Site engineers raise indents for gypsum board, plywood, laminate and cable against the package they belong to. The store sees what has arrived, and the project manager sees what has been used. Excess and shortage show up while a gang is still on site. Orders follow real use.

Snag list and handover file in one place

The walk with the client’s facilities team is recorded line by line with photographs and a closing date. Rework is closed against each entry. At handover, the final bill, the snag list and the closing records can go to the client as one file. Closure is documented.

What the software does

What we would build for commercial interior fit-out contractors.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

BOQ, estimate and quotation

Build the BOQ line by line with materials and labour, issue the quotation from it, and record actual spend against each line as the job goes on.

Packages and subcontractor work orders

Split a project into trade packages, issue each subcontractor a work order with scope, rate and advance, and follow what is measured and paid against it.

Measurements and running bills

Record measured quantities against BOQ lines and prepare the client’s running bill, with deductions, advance recovery and retention as separate lines.

Variations and client approvals

Log each change request with its quantity and cost, and tie the client’s approval to the version it refers to, so extra work is billed on a record.

Material requests, purchase orders and site stock

Raise indents from site, send purchase orders to vendors, and follow what was ordered, received and left over at each site.

Site progress and photographs

Record stage progress with dated photographs, so the client’s team and the head office see one picture of each floor.

Snag list and handover

Record snag items by area with an owner and a closing date, and keep the handover file in one place. GullySystem adds this module as custom work.

Drawing and RFI register

Revised floor plans, ceiling layouts and service drawings are logged with issue dates. Queries to the designer are tracked until answered. Site engineers build only from the latest issue.

Site safety and permit log

Hot work, work at height and night access permits are recorded with the gang and area. Toolbox talks list who attended. The safety officer sees which permit has expired before work continues.

Retention and bond tracker

Client retention amounts, bank bonds and their expiry dates are held per contract. A release date is set from handover. The finance head sees which bond needs renewing next.

Before you talk to a supplier

A requirements checklist for commercial interior fit-out contractors.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules commercial interior fit-out contractors use most.

Each one is also available on its own, or inside a system built for you.

Purchase Order Management

Orders for gypsum boards, galvanised channels, cables and floor tiles are raised against a site and a BOQ package. Delivery lands at the site store. Budget used per package shows before approval.

Learn more

Project Timelines with Gantt Charts

Partition, ceiling, electrical, flooring and paint gangs are drawn as bars on one plan, with the handover date fixed at the end. A late ceiling shifts the painters’ start. The site manager moves a gang and sees the knock-on.

Learn more

Project Management Reports

Package-wise progress, certified value, cost to date and open snags are gathered for the directors and the client’s project manager. Subcontractor overruns stand out. Directors compare margin site by site.

Learn more

Quote & Proposal Management

A shop or office fit-out is priced from area, finish grade and specification, with provisional sums and exclusions listed on the face. Alternative finishes go in as options. Sales staff send one numbered proposal per revision.

Learn more

Client Portal

The client’s facilities head and the interior designer log in to see progress photos, approved variations and the snag list. They approve material samples and sign the handover. Comments stay tied to the room.

Learn more

Workflow and Approvals

A variation goes from site engineer to project manager to the client’s representative before work starts. Rate changes and extra packages need the director’s sign-off. Nothing proceeds on a verbal go-ahead.

Learn more

Lead Management

Enquiries from property managers, brand retailers and office tenants are logged with floor area and target opening date. Site visits and drawings received are noted. A won enquiry opens a project.

Learn more

Vendor Management

Partition, electrical, HVAC and flooring subcontractors are listed with rates, trade licences and past packages. Delays and snag counts are noted. Estimators pick a name for the next tender from that record.

Learn more
AI by department

Where AI can help commercial interior fit-out contractors.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

BOQ, estimate and quotation

Which assumptions stop being valid when the quotation changes?

For “BOQ, estimate and quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Packages and subcontractor work orders

Is the plan based on demand that is still open?

Review “Packages and subcontractor work orders” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Common questions

Questions commercial interior fit-out contractors ask before they call.

Is this for designers or for contractors?

Both. The linked products were built for design studios and for builders, and a fit-out contractor sits between them. We use both as the base and adapt the screens to your BOQ and billing.

Can it handle running bills with retention?

Yes. The construction product builds running bills from measurements, with advance recovery and retention held back. Your own bill format is matched during implementation.

Does it replace AutoCAD or project scheduling tools?

No. Drawings made elsewhere are attached to the project, and nothing is drawn here. A critical path programme stays in your planning tool.

Can bills reach our accounting system?

No live connection to their package is built in. Your accountant gets a list of client bills, vendor bills and payments. A file export for their package is scoped as separate work.

How is a fit-out contractor system costed?

Scope first: BOQ and estimate, packages and work orders, measurements and running bills, variations, material requests, progress photos and snag lists. Live projects, site engineers and users add to it, as does a link to your accounts. Once your own BOQ is on screen, you receive a quotation with a price per part.

What should a fit-out contractor bring to the start?

Bring a recent BOQ, a subcontractor work order, a running bill with retention, a variation approval, a material indent and a snag list. Please name a project manager, a site engineer, a quantity surveyor and an accounts person who can answer questions and try screens.

If we stop, who has the project and bill records?

You keep everything. Project and bill records, along with the code, remain with the company, and documents can be pulled out as plain files. Our team supports it. GullySystem arranges hosting unless you choose otherwise.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements